E 800 N over FALL RIVER CANAL

0.2 N. 2.6 E. CHESTER · County 043, Idaho · Built 1976 · 2 Lanes · 50 vehicles/day

Overall
Fair
Deck
8
Very Good
Superstructure
7
Good
Substructure
5
Fair

Bridge Details

Structure #
000000000032065
Year Built
1976
Length
9.8 m (32.2 ft)
Max Span
9.4 m
Width
8.5 m (27.9 ft)
Lanes
2
Daily Traffic
50
Material
Prestressed Concrete
Design
Tee Beam
Owner
County Highway Agency
Last Inspected
N/A
Est. Improvement
$227,000
Total Project Cost
$341,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.