US 20 over FALL RIVER

1 N. CHESTER · County 043, Idaho · Built 1963 · 2 Lanes · 8,000 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
6
Satisfactory
Substructure
5
Fair

Bridge Details

Structure #
000000000012665
Year Built
1963
Length
34.7 m (113.8 ft)
Max Span
16.8 m
Width
12.8 m (42 ft)
Lanes
2
Daily Traffic
8,000
Material
Prestressed Concrete
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$1,172,000
Total Project Cost
$1,758,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.