E 800 N over CROSSCUT CANAL

0.1 N. 0.8 W. CHESTER · County 043, Idaho · Built 1990 · 2 Lanes · 80 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
000000000032016
Year Built
1990
Length
14.6 m (47.9 ft)
Max Span
14.3 m
Width
7.8 m (25.6 ft)
Lanes
2
Daily Traffic
80
Material
Prestressed Concrete
Design
Tee Beam
Owner
County Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.