US 20 WBL & EBL over S.FK.FALL RIVER CANAL

1.8 S. CHESTER · County 043, Idaho · Built 1973 · 5 Lanes · 10,500 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
6
Satisfactory
Substructure
6
Satisfactory

Bridge Details

Structure #
000000000012645
Year Built
1973
Length
23.2 m (76.1 ft)
Max Span
11.3 m
Width
34.9 m (114.5 ft)
Lanes
5
Daily Traffic
10,500
Material
Prestressed Concrete
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$1,990,000
Total Project Cost
$2,985,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.