2900 WEST over BIG LOST RIVER

3.5 S. 1.2 E. ARCO · County 023, Idaho · Built 1978 · 1 Lanes · 50 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
6
Satisfactory
Substructure
6
Satisfactory

Bridge Details

Structure #
000000000031515
Year Built
1978
Reconstructed
2019
Length
17.4 m (57.1 ft)
Max Span
16.5 m
Width
6.8 m (22.3 ft)
Lanes
1
Daily Traffic
50
Material
Steel
Design
Girder and Floorbeam System
Owner
County Highway Agency
Last Inspected
N/A
Est. Improvement
$370,000
Total Project Cost
$554,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.