2150 N over BIG LOST RIVER

3.5 S. 0.9 E. ARCO · County 023, Idaho · Built 1930 · 2 Lanes · 30 vehicles/day

Overall
Fair
Deck
7
Good
Superstructure
7
Good
Substructure
6
Satisfactory

Bridge Details

Structure #
000000000031440
Year Built
1930
Reconstructed
1987
Length
11.9 m (39 ft)
Max Span
11.6 m
Width
7.3 m (24 ft)
Lanes
2
Daily Traffic
30
Material
Prestressed Concrete
Design
Tee Beam
Owner
County Highway Agency
Last Inspected
N/A
Est. Improvement
$286,000
Total Project Cost
$430,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.