TWO MILE GULCH over S.FK.CDA R;TWO MILE CR.
0.4 N. 0.1 E. OSBURN · County 079, Idaho · Built 1966 · 1 Lanes · 440 vehicles/day
Overall
Deck
7
Good
Superstructure
6
Satisfactory
Substructure
5
Fair
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 7 | Good |
| Superstructure | 6 | Satisfactory |
| Substructure | 5 | Fair |
Location
47.509781, -115.997408
This bridge is in worse condition than 65.5% of bridges in County 079. The average bridge in Idaho is 0 years old; this one is 60 years old.
Nearby Bridges
I 90 WBL over I 90B;THIRD ST.IC
Built 1969
I 90 EBL over I 90B;THIRD ST.IC
Built 1969
I 90 EBL over S.FK.COEUR DALENE RIVER
Built 1978
TERROR GULCH over S.FK.CDA R;TERROR GULCH
Built 1973
I 90 WBL over STC 5766;JOHNSON ST.GS
Built 1969
I 90 EBL over STC 5766;JOHNSON ST.GS
Built 1969
S5765;SILVR VALLEY over S.FK.COEUR DALENE RIVER
Built 1949
I 90 WBL over S.FK.COEUR DALENE RIVER
Built 1969
I 90 EBL over S.FK.COEUR DALENE RIVER
Built 1969
I 90 WBL over S.FK.COEUR DALENE RIVER
Built 1978
Bridge Details
- Structure #
- 000000000030980
- Year Built
- 1966
- Length
- 29.9 m (98.1 ft)
- Max Span
- 18 m
- Width
- 6.5 m (21.3 ft)
- Lanes
- 1
- Daily Traffic
- 440
- Material
- Steel
- Design
- Stringer/Multi-beam or Girder
- Owner
- County Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $784,000
- Total Project Cost
- $1,176,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.