I 90 WBL over S.FK.COEUR DALENE RIVER
2.8 W. WALLACE · County 079, Idaho · Built 1978 · 2 Lanes · 5,750 vehicles/day
Overall
Deck
6
Satisfactory
Superstructure
6
Satisfactory
Substructure
5
Fair
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 6 | Satisfactory |
| Superstructure | 6 | Satisfactory |
| Substructure | 5 | Fair |
Location
47.491369, -115.966236
This bridge is in worse condition than 65.5% of bridges in County 079. The average bridge in Idaho is 0 years old; this one is 48 years old.
Nearby Bridges
I 90 over STC 5766;SILVERTON IC
Built 1978
I 90B LOOP over S.FK.COEUR DALENE RIVER
Built 1978
I 90 EB & WB over S.FK.CDA R;FR.RD.
Built 1978
I 90 over S.FK.COEUR DALENE RIVER
Built 1987
I 90 EBL over S.FK.COEUR DALENE RIVER
Built 1978
I 90 EBL & WBL over CROSSROAD BD;W.WALLACE I
Built 1987
I 90 EBL over I 90B;THIRD ST.IC
Built 1969
I 90 WBL over I 90B;THIRD ST.IC
Built 1969
TWO MILE GULCH over S.FK.CDA R;TWO MILE CR.
Built 1966
I 90B over PLACER CREEK
Built 1942
Bridge Details
- Structure #
- 000000000017215
- Year Built
- 1978
- Length
- 56.1 m (184.1 ft)
- Max Span
- 18.6 m
- Width
- 13.3 m (43.6 ft)
- Lanes
- 2
- Daily Traffic
- 5,750
- Material
- Prestressed Concrete
- Design
- Stringer/Multi-beam or Girder
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $1,355,000
- Total Project Cost
- $2,033,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.