PINE DRIVE; NF 301 over W.FK.ST MARIES RIVER
2.0 S. 0.8 W. CLARKIA · County 079, Idaho · Built 1973 · 2 Lanes · 130 vehicles/day
Structurally Deficient
— One or more key components rated 4 (Poor) or below
Overall
Deck
4
Poor
Superstructure
5
Fair
Substructure
4
Poor
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 4 | Poor |
| Superstructure | 5 | Fair |
| Substructure | 4 | Poor |
Location
46.223467, -116.267817
This bridge is in worse condition than 90.4% of bridges in County 079. The average bridge in Idaho is 0 years old; this one is 53 years old.
Nearby Bridges
SH 162 over LONG HOLLOW CREEK
Built 1964
MAPLE STREET over LONG HOLLOW CREEK
Built 1920
SH 64 over LONG HOLLOW CREEK
Built 1999
SH 162 over LAWYERS CANYON CREEK
Built 1964
US 95 over LAWYERS CANYON CREEK
Built 1991
ACCESS RD; PARK RD over LAWYERS CREEK;PARK BR
Built 1917
US 95 over DRAIN
Built 1991
SH 162 over LAWYERS CANYON CREEK
Built 2002
SH 162 over SEVEN MILE CREEK
Built 1949
Bridge Details
- Structure #
- 000000000030805
- Year Built
- 1973
- Length
- 9.1 m (29.9 ft)
- Max Span
- 9.1 m
- Width
- 7.7 m (25.3 ft)
- Lanes
- 2
- Daily Traffic
- 130
- Material
- Steel
- Design
- Stringer/Multi-beam or Girder
- Owner
- Other Local Agencies
- Last Inspected
- N/A
- Est. Improvement
- $252,000
- Total Project Cost
- $379,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.