MAPLE STREET over LONG HOLLOW CREEK
IN NEZPERCE;MAPLE & 9TH. · County 061, Idaho · Built 1920 · 2 Lanes · 70 vehicles/day
Overall
Deck
7
Good
Superstructure
7
Good
Substructure
5
Fair
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 7 | Good |
| Superstructure | 7 | Good |
| Substructure | 5 | Fair |
Location
46.229728, -116.238844
This bridge is in worse condition than 81% of bridges in County 061. The average bridge in Idaho is 0 years old; this one is 106 years old.
Nearby Bridges
SH 162 over LONG HOLLOW CREEK
Built 1964
SH 64 over LONG HOLLOW CREEK
Built 1999
PINE DRIVE; NF 301 over W.FK.ST MARIES RIVER
Built 1973
SH 162 over LAWYERS CANYON CREEK
Built 1964
US 95 over LAWYERS CANYON CREEK
Built 1991
ACCESS RD; PARK RD over LAWYERS CREEK;PARK BR
Built 1917
SH 162 over LAWYERS CANYON CREEK
Built 2002
SH 162 over SEVEN MILE CREEK
Built 1949
SH 162 over SEVEN MILE CREEK
Built 1997
NICHOLES ROAD over LAWYER CREEK;SW.KAMIAH B
Built 1950
Bridge Details
- Structure #
- 000000000029770
- Year Built
- 1920
- Reconstructed
- 1965
- Length
- 9.8 m (32.2 ft)
- Max Span
- 4.9 m
- Width
- 6.2 m (20.3 ft)
- Lanes
- 2
- Daily Traffic
- 70
- Material
- Concrete Continuous
- Design
- Slab
- Owner
- City or Municipal Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $148,000
- Total Project Cost
- $222,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.