S5765;SILVR VALLEY over MOON GULCH

0.1 S. 3.0 E. KELLOGG · County 079, Idaho · Built 2024 · 2 Lanes · 1,200 vehicles/day

Overall
Good
Deck
9
Excellent
Superstructure
9
Excellent
Substructure
9
Excellent

Bridge Details

Structure #
000000000030801
Year Built
2024
Length
11 m (36.1 ft)
Max Span
9.1 m
Width
13.4 m (44 ft)
Lanes
2
Daily Traffic
1,200
Material
Prestressed Concrete
Design
Box Beam or Girders - Multiple
Owner
County Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.