ELK CREEK ROAD over MOON GULCH;NE.KELLOGG BR
0.1 N. 3.0 E. KELLOGG · County 079, Idaho · Built 1919 · 1 Lanes · 50 vehicles/day
Overall
Deck
5
Fair
Superstructure
5
Fair
Substructure
6
Satisfactory
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 5 | Fair |
| Superstructure | 5 | Fair |
| Substructure | 6 | Satisfactory |
Location
47.533381, -116.058569
This bridge is in worse condition than 65.5% of bridges in County 079. The average bridge in Idaho is 0 years old; this one is 107 years old.
Nearby Bridges
S5765;SILVR VALLEY over MOON GULCH
Built 2024
COUNTRY CLUB ROAD over BIG CREEK;NW.OSBURN BR
Built 2024
STC 5756;BIG CR RD over S.FK.COEUR DALENE RIVER
Built 1966
I 90 EBL over STC 5756;BIG CREEK RD IC
Built 1969
I 90 WBL over STC 5756;BIG CREEK RD IC
Built 1969
I 90 WBL over ELIZABETH PARK
Built 2023
I 90 EBL over ELIZABETH PARK
Built 2022
ELIZABETH PARK RD over S.FK.COEUR DALENE RIVER
Built 1968
I 90 EBL over S.FK.COEUR DALENE RIVER
Built 1969
I 90 WBL over S.FK.COEUR DALENE RIVER
Built 1969
Bridge Details
- Structure #
- 000000000030760
- Year Built
- 1919
- Length
- 10.7 m (35.1 ft)
- Max Span
- 10.4 m
- Width
- 6.2 m (20.3 ft)
- Lanes
- 1
- Daily Traffic
- 50
- Material
- Concrete
- Design
- Tee Beam
- Owner
- County Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $388,000
- Total Project Cost
- $582,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.