TALL PINES ROAD over DAWSON CREEK
6 S. 5 W. COEUR DALENE · County 055, Idaho · Built 2009 · 2 Lanes · 230 vehicles/day
Overall
Deck
7
Good
Superstructure
7
Good
Substructure
8
Very Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 7 | Good |
| Superstructure | 7 | Good |
| Substructure | 8 | Very Good |
Location
47.603611, -116.871111
This bridge is in worse condition than 15.7% of bridges in County 055. The average bridge in Idaho is 0 years old; this one is 17 years old.
Nearby Bridges
LOFFS BAY ROAD over MICA CREEK
Built 2006
US 95 over MICA CREEK
Built 1988
US 95 over S. FK. MICA CREEK
Built 2003
S MCAVOY ROAD over COUGAR CREEK
Built 1940
US 95 over COUGAR CREEK
Built 1985
US 95 SBL over BELLGROVE CREEK
Built 2002
US 95 NBL over BELLGROVE CREEK
Built 2003
US 95 over BLACKWELL SLOUGH
Built 1969
W HARBOR DRIVE over CHANNEL OF SPOKANE RIVER
Built 2000
FRONT AVENUE over CDA PARKING GARAGE
Built 2014
Bridge Details
- Structure #
- 000000000030493
- Year Built
- 2009
- Length
- 13.1 m (43 ft)
- Max Span
- 12.5 m
- Width
- 9.8 m (32.2 ft)
- Lanes
- 2
- Daily Traffic
- 230
- Material
- Prestressed Concrete
- Design
- Stringer/Multi-beam or Girder
- Owner
- Other Local Agencies
- Last Inspected
- N/A
- Est. Improvement
- N/A
- Total Project Cost
- N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.