US 95 SBL over BELLGROVE CREEK
14.1 S COEUR D ALENE · County 055, Idaho · Built 2002 · 2 Lanes · 4,150 vehicles/day
Overall
Deck
7
Good
Superstructure
8
Very Good
Substructure
8
Very Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 7 | Good |
| Superstructure | 8 | Very Good |
| Substructure | 8 | Very Good |
Location
47.54065, -116.922872
This bridge is in worse condition than 15.7% of bridges in County 055. The average bridge in Idaho is 0 years old; this one is 24 years old.
Nearby Bridges
US 95 NBL over BELLGROVE CREEK
Built 2003
US 95 SBL over FIGHTING CREEK
Built 2007
US 95 NBL over FIGHTING CREEK
Built 2006
S WATSON ROAD over FIGHTING CREEK
Built 2021
US 95 over S. FK. MICA CREEK
Built 2003
US 95 over MICA CREEK
Built 1988
LOFFS BAY ROAD over MICA CREEK
Built 2006
US 95 SBL over LAKE CREEK;NESS ROAD
Built 2007
TALL PINES ROAD over DAWSON CREEK
Built 2009
W POIRER ROAD over LAKE CREEK
Built 1950
Bridge Details
- Structure #
- 000000000018647
- Year Built
- 2002
- Length
- 20.7 m (67.9 ft)
- Max Span
- 20.7 m
- Width
- 12.6 m (41.3 ft)
- Lanes
- 2
- Daily Traffic
- 4,150
- Material
- Prestressed Concrete
- Design
- Stringer/Multi-beam or Girder
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- N/A
- Total Project Cost
- N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.