STC 7185;APPLEWAY over APPLEWAY PED OP

IN COEUR DALENE;APPLEWAY · County 055, Idaho · Built 1971 · 2 Lanes · 3,600 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
6
Satisfactory
Substructure
5
Fair

Bridge Details

Structure #
000000000030440
Year Built
1971
Length
34.7 m (113.8 ft)
Max Span
11.3 m
Width
15.3 m (50.2 ft)
Lanes
2
Daily Traffic
3,600
Material
Concrete
Design
Tee Beam
Owner
City or Municipal Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.