US 95 over I 90 E-WB;LINCOLN WAY IC
IN COEUR DALENE · County 055, Idaho · Built 1960 · 5 Lanes · 33,500 vehicles/day
Overall
Deck
5
Fair
Superstructure
5
Fair
Substructure
5
Fair
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 5 | Fair |
| Superstructure | 5 | Fair |
| Substructure | 5 | Fair |
Location
47.698878, -116.791725
This bridge is in worse condition than 84.3% of bridges in County 055. The average bridge in Idaho is 0 years old; this one is 66 years old.
Nearby Bridges
SMA 7155;GOVT WAY over I 90 EB-WB; GOVT WAY GS
Built 2006
STC 7195;4TH ST. over I 90 EB-WB;4TH ST.IC
Built 1985
SMA7235;NW BLVD over I 90 EB-WB;NW BLVD IC
Built 2001
7TH STREET over I 90 EB-WB;7TH ST GS
Built 1960
US 95 over I 90B;NW BLVD;US 95 IC
Built 1968
US 95 over SPOKANE R;PED/BIKE PATH
Built 1968
9TH ST over I 90 EB-WB;9TH ST GS
Built 1960
STC 7185;APPLEWAY over APPLEWAY PED OP
Built 1971
I 90 WBL over PEDESTRIAN/BIKE PATH
Built 1971
I 90 EBL over PEDESTRIAN/BIKE PATH
Built 1971
Bridge Details
- Structure #
- 000000000018690
- Year Built
- 1960
- Reconstructed
- 2009
- Length
- 58.5 m (191.9 ft)
- Max Span
- 18 m
- Width
- 21.6 m (70.9 ft)
- Lanes
- 5
- Daily Traffic
- 33,500
- Material
- Prestressed Concrete
- Design
- Stringer/Multi-beam or Girder
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $2,350,000
- Total Project Cost
- $3,525,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.