RUBY CREEK RD over DEEP CRK;RUBY CREEK(#1)

3.4 N. 0.3 W. NAPLES · County 021, Idaho · Built 1975 · 2 Lanes · 30 vehicles/day

Overall
Fair
Deck
5
Fair
Superstructure
5
Fair
Substructure
5
Fair

Bridge Details

Structure #
000000000030270
Year Built
1975
Length
17.4 m (57.1 ft)
Max Span
16.8 m
Width
6.2 m (20.3 ft)
Lanes
2
Daily Traffic
30
Material
Concrete
Design
Tee Beam
Owner
County Highway Agency
Last Inspected
N/A
Est. Improvement
$370,000
Total Project Cost
$554,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.