HOLMES CROSSING RD over LAWYER CREEK
4.0 W. FERDINAND · County 061, Idaho · Built 1965 · 1 Lanes · 20 vehicles/day
Overall
Deck
6
Satisfactory
Superstructure
6
Satisfactory
Substructure
5
Fair
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 6 | Satisfactory |
| Superstructure | 6 | Satisfactory |
| Substructure | 5 | Fair |
Location
46.152603, -116.474025
This bridge is in worse condition than 81% of bridges in County 061. The average bridge in Idaho is 0 years old; this one is 61 years old.
Nearby Bridges
WESTLAKE ROAD over WILLOW CREEK
Built 1996
ACCESS RD; PARK RD over LAWYERS CREEK;PARK BR
Built 1917
US 95 over LAWYERS CANYON CREEK
Built 1991
US 95 over DRAIN
Built 1991
MCCORMACK RDG RD over MISSION CREEK
Built 2013
US 95B over LAPWAI CREEK
Built 2002
US 95 over COTTONWOOD CREEK
Built 1978
US 95 over LAPWAI CREEK
Built 2019
US 95 over LAPWAI CREEK
Built 2019
Bridge Details
- Structure #
- 000000000029300
- Year Built
- 1965
- Reconstructed
- 1982
- Length
- 7 m (23 ft)
- Max Span
- 6.7 m
- Width
- 6.7 m (22 ft)
- Lanes
- 1
- Daily Traffic
- 20
- Material
- Steel
- Design
- Stringer/Multi-beam or Girder
- Owner
- Other Local Agencies
- Last Inspected
- N/A
- Est. Improvement
- $213,000
- Total Project Cost
- $319,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.