MCCORMACK RDG RD over MISSION CREEK
3.5 S. 1.0 W. WINCHESTER · County 061, Idaho · Built 2013 · 2 Lanes · 50 vehicles/day
Overall
Deck
8
Very Good
Superstructure
8
Very Good
Substructure
8
Very Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 8 | Very Good |
| Superstructure | 8 | Very Good |
| Substructure | 8 | Very Good |
Location
46.188889, -116.647944
This bridge is in worse condition than 9.5% of bridges in County 061. The average bridge in Idaho is 0 years old; this one is 13 years old.
Nearby Bridges
US 95B over LAPWAI CREEK
Built 2002
US 95 over LAPWAI CREEK
Built 2019
US 95 over LAPWAI CREEK
Built 2019
US 95 over LAPWAI CREEK
Built 2019
US 95 over LAPWAI CREEK
Built 2019
US 95 over LAPWAI CREEK
Built 2019
US 95 over LAPWAI CREEK
Built 2020
US 95 over LAPWAI CREEK
Built 2020
US 95 over LAPWAI CREEK
Built 2020
US 95 over LAPWAI CREEK
Built 2020
Bridge Details
- Structure #
- 000000000029798
- Year Built
- 2013
- Length
- 15.5 m (50.9 ft)
- Max Span
- 14.6 m
- Width
- 8.5 m (27.9 ft)
- Lanes
- 2
- Daily Traffic
- 50
- Material
- Steel
- Design
- Stringer/Multi-beam or Girder
- Owner
- Other Local Agencies
- Last Inspected
- N/A
- Est. Improvement
- N/A
- Total Project Cost
- N/A