STC 4721;BRIDGE ST over S.FK.CLEARWATER RIVER
IN STITES · County 049, Idaho · Built 1961 · 2 Lanes · 780 vehicles/day
Overall
Deck
6
Satisfactory
Superstructure
7
Good
Substructure
7
Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 6 | Satisfactory |
| Superstructure | 7 | Good |
| Substructure | 7 | Good |
Location
46.091425, -115.97755
This bridge is in worse condition than 41.7% of bridges in County 049. The average bridge in Idaho is 0 years old; this one is 65 years old.
Nearby Bridges
STC 4721; S RIVER over COTTONWOOD CREEK
Built 1964
LUKES GULCH ROAD over THREE MILE CREEK
Built 1965
STC 4715;CLEAR CRK over CLEAR CREEK
Built 2021
B AVE over S. FORK CLEARWATER
Built 1963
SH 13B over M.F.CLWATER R.;E.KOOSKIA
Built 1935
SH 13 over M.FK.CLEARWATER RIVER
Built 1994
SKYLINE LOOP RD over CLEAR CREEK
Built 1984
US 12 over MAGGIE CREEK
Built 2018
STC4715;CLEARCREEK over CLEAR CREEK
Built 1965
SH 162 over SEVEN MILE CREEK
Built 1997
Bridge Details
- Structure #
- 000000000029250
- Year Built
- 1961
- Length
- 55.8 m (183.1 ft)
- Max Span
- 18 m
- Width
- 8.9 m (29.2 ft)
- Lanes
- 2
- Daily Traffic
- 780
- Material
- Prestressed Concrete
- Design
- Stringer/Multi-beam or Girder
- Owner
- County Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $1,461,000
- Total Project Cost
- $2,192,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.