LUKES GULCH ROAD over THREE MILE CREEK
2.8 S. 0.4 W. STITES · County 049, Idaho · Built 1965 · 1 Lanes · 430 vehicles/day
Overall
Deck
5
Fair
Superstructure
6
Satisfactory
Substructure
5
Fair
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 5 | Fair |
| Superstructure | 6 | Satisfactory |
| Substructure | 5 | Fair |
Location
46.051042, -115.98315
This bridge is in worse condition than 73.6% of bridges in County 049. The average bridge in Idaho is 0 years old; this one is 61 years old.
Nearby Bridges
STC 4721; S RIVER over COTTONWOOD CREEK
Built 1964
STC 4721;BRIDGE ST over S.FK.CLEARWATER RIVER
Built 1961
SKYLINE LOOP RD over CLEAR CREEK
Built 1984
STC4715;CLEARCREEK over CLEAR CREEK
Built 1965
STC 4715;CLEAR CRK over CLEAR CREEK
Built 2021
B AVE over S. FORK CLEARWATER
Built 1963
SH 13 over S.F.CLEARWATER;HARPSTER
Built 1985
SH 13B over M.F.CLWATER R.;E.KOOSKIA
Built 1935
US 12 over MAGGIE CREEK
Built 2018
SH 13 over M.FK.CLEARWATER RIVER
Built 1994
Bridge Details
- Structure #
- 000000000029210
- Year Built
- 1965
- Length
- 11.3 m (37.1 ft)
- Max Span
- 10.7 m
- Width
- 5.5 m (18 ft)
- Lanes
- 1
- Daily Traffic
- 430
- Material
- Steel
- Design
- Stringer/Multi-beam or Girder
- Owner
- County Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $287,000
- Total Project Cost
- $431,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.