STC 8206;E 6TH ST over GALLOWAY CANAL
0.5 N. 0.8 E. WEISER · County 087, Idaho · Built 1990 · 2 Lanes · 1,300 vehicles/day
Overall
Culvert
6
Satisfactory
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Culvert | 6 | Satisfactory |
Location
44.258342, -116.959358
This bridge is in worse condition than 36.3% of bridges in County 087. The average bridge in Idaho is 0 years old; this one is 36 years old.
Nearby Bridges
US 95 over GALLOWAY CANAL
Built 1999
STC 8216;E 9TH ST over GALLOWAY CANAL
Built 1975
STC 3881;STATE ST over GALLOWAY CANAL
Built 1977
US 95 over MONROE CREEK
Built 1999
US 95 over WEISER RIVER
Built 2013
STC 8202;W 9TH ST over GALLOWAY CANAL
Built 2021
W. COMMERCIAL ST. over US 95 SPUR;COMMERCIAL UP
Built 1960
COUNTY ROAD over US 95 SPUR; WEISER IC
Built 1960
STC 8217;COVE ROAD over WEISER RIVER
Built 1917
OR 201 (HWY 491) over Snake River (Weiser)
Built 2010
Bridge Details
- Structure #
- 000000000028745
- Year Built
- 1990
- Length
- 7.3 m (24 ft)
- Max Span
- 6.2 m
- Width
- 16.3 m (53.5 ft)
- Lanes
- 2
- Daily Traffic
- 1,300
- Material
- Steel
- Design
- Culvert
- Owner
- County Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- N/A
- Total Project Cost
- N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.