STC 8216;E 9TH ST over GALLOWAY CANAL

0.4 N. 1.0 E. WEISER · County 087, Idaho · Built 1975 · 2 Lanes · 270 vehicles/day

Overall
Fair
Deck
7
Good
Superstructure
6
Satisfactory
Substructure
6
Satisfactory

Bridge Details

Structure #
000000000028705
Year Built
1975
Length
8.5 m (27.9 ft)
Max Span
7.9 m
Width
6.9 m (22.6 ft)
Lanes
2
Daily Traffic
270
Material
Prestressed Concrete
Design
Tee Beam
Owner
County Highway Agency
Last Inspected
N/A
Est. Improvement
$275,000
Total Project Cost
$413,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.