STC 3944;ELO ROAD over LAKE FORK CREEK
2.7 S. 2.6 E. MCCALL · County 085, Idaho · Built 1973 · 2 Lanes · 1,500 vehicles/day
Overall
Deck
6
Satisfactory
Superstructure
6
Satisfactory
Substructure
5
Fair
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 6 | Satisfactory |
| Superstructure | 6 | Satisfactory |
| Substructure | 5 | Fair |
Location
44.872236, -116.045972
This bridge is in worse condition than 85.6% of bridges in County 085. The average bridge in Idaho is 0 years old; this one is 53 years old.
Nearby Bridges
STC 3944;ELO ROAD over LAKE FORK CANAL
Built 1996
S3945;EAST LAKE FK over LAKE FORK CREEK
Built 2017
SH 55 over LAKE FORK CREEK CANAL
Built 1998
STC3907; DEINHARD over N. FK. PAYETTE RIVER
Built 2005
SH 55 over N.FK.PAYETTE R;LARDO
Built 2014
SPINK LANE over BOULDER CREEK
Built 2004
SH 55 over LAKE FORK CREEK
Built 1985
PADDY FLAT ROAD over BOULDER CREEK
Built 1978
LICK CREEK ROAD over N. FK. LAKE FK. CREEK
Built 1949
SCHELINE LANE over LAKE FORK CREEK
Built 1976
Bridge Details
- Structure #
- 000000000028660
- Year Built
- 1973
- Length
- 18.3 m (60 ft)
- Max Span
- 8.5 m
- Width
- 8.4 m (27.6 ft)
- Lanes
- 2
- Daily Traffic
- 1,500
- Material
- Prestressed Concrete
- Design
- Tee Beam
- Owner
- County Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $582,000
- Total Project Cost
- $873,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.