SE 2ND AVENUE over LANGLEY GULCH

2.5S 1.2E NEW PLYMOUTH · County 075, Idaho · Built 1975 · 2 Lanes · 250 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
6
Satisfactory
Substructure
7
Good

Bridge Details

Structure #
000000000028530
Year Built
1975
Length
7 m (23 ft)
Max Span
6.7 m
Width
7.4 m (24.3 ft)
Lanes
2
Daily Traffic
250
Material
Prestressed Concrete
Design
Tee Beam
Owner
Other Local Agencies
Last Inspected
N/A
Est. Improvement
$213,000
Total Project Cost
$320,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.