SE 2ND AVENUE over LANGLEY GULCH
2.5S 1.2E NEW PLYMOUTH · County 075, Idaho · Built 1975 · 2 Lanes · 250 vehicles/day
Overall
Deck
6
Satisfactory
Superstructure
6
Satisfactory
Substructure
7
Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 6 | Satisfactory |
| Superstructure | 6 | Satisfactory |
| Substructure | 7 | Good |
Location
43.937989, -116.794131
This bridge is in worse condition than 20% of bridges in County 075. The average bridge in Idaho is 0 years old; this one is 51 years old.
Nearby Bridges
STC3857;SND HOLLOW over FARMERS COOP CANAL
Built 1955
S.E. 3RD AVENUE over LANGLEY GULCH
Built 1978
US 30 over FARMERS COOP CANAL
Built 1960
SH 52 over NOBLE CANAL
Built 1990
CASSIA ROAD over FARMERS COOP CANAL
Built 1959
US 30 over I 84;NEW PLYMOUTH IC
Built 1960
SH 52 over B LATERAL CANAL
Built 1990
SH 52 over IN&P RR
Built 2018
HOLLY ST. over NOBLE CANAL
Built 1972
US 30 over NOBLE CANAL
Built 1926
Bridge Details
- Structure #
- 000000000028530
- Year Built
- 1975
- Length
- 7 m (23 ft)
- Max Span
- 6.7 m
- Width
- 7.4 m (24.3 ft)
- Lanes
- 2
- Daily Traffic
- 250
- Material
- Prestressed Concrete
- Design
- Tee Beam
- Owner
- Other Local Agencies
- Last Inspected
- N/A
- Est. Improvement
- $213,000
- Total Project Cost
- $320,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.