US 30 over I 84;NEW PLYMOUTH IC
11.9 W. CALDWELL · County 075, Idaho · Built 1960 · 2 Lanes · 1,200 vehicles/day
Overall
Deck
7
Good
Superstructure
5
Fair
Substructure
5
Fair
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 7 | Good |
| Superstructure | 5 | Fair |
| Substructure | 5 | Fair |
Location
43.907147, -116.815453
This bridge is in worse condition than 61.5% of bridges in County 075. The average bridge in Idaho is 0 years old; this one is 66 years old.
Nearby Bridges
S.E. 3RD AVENUE over LANGLEY GULCH
Built 1978
STC3857;SND HOLLOW over A LINE CANAL
Built 1965
SE 2ND AVENUE over LANGLEY GULCH
Built 1975
STC3857;SND HOLLOW over FARMERS COOP CANAL
Built 1955
US 30 over FARMERS COOP CANAL
Built 1960
SE 4TH AVENUE over GRAVEYARD GULCH
Built 1969
CASSIA ROAD over FARMERS COOP CANAL
Built 1959
BLACK CANYON ROAD over I 84;BLACK CANYON RD IC
Built 1960
SE 3RD AVENUE over GRAVEYARD GULCH
Built 1968
ELGIN ROAD over FARMERS COOP CANAL
Built 1950
Bridge Details
- Structure #
- 000000000013485
- Year Built
- 1960
- Length
- 70.4 m (231 ft)
- Max Span
- 14.8 m
- Width
- 10 m (32.8 ft)
- Lanes
- 2
- Daily Traffic
- 1,200
- Material
- Prestressed Concrete
- Design
- Stringer/Multi-beam or Girder
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $1,871,000
- Total Project Cost
- $2,807,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.