STC3831;LTL FRZOUT over BLACK CANYON CANAL
1.9 S. 5.8 W. EMMETT · County 045, Idaho · Built 1973 · 2 Lanes · 2,500 vehicles/day
Overall
Deck
7
Good
Superstructure
6
Satisfactory
Substructure
6
Satisfactory
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 7 | Good |
| Superstructure | 6 | Satisfactory |
| Substructure | 6 | Satisfactory |
Location
43.847464, -116.617286
This bridge is in worse condition than 24.6% of bridges in County 045. The average bridge in Idaho is 0 years old; this one is 53 years old.
Nearby Bridges
W SOUTH SLOPE RD over FARMERS COOP CANAL
Built 1955
STC 3831;S. SLOPE over FARMERS COOP CANAL
Built 2023
BOWMAN ROAD over FARMERS COOP CANAL
Built 1967
SH 52 over DRAIN DITCH
Built 1988
VANDERDASSON RD over SEVEN MILE SLOUGH
Built 2013
STC 3842;STAR LANE over FARMERS COOP CANAL
Built 1976
BISHOP ROAD over FARMERS COOP CANAL
Built 2010
STC3830;IDAHO BLVD over PAYETTE RIVER;E.LETHA BR
Built 1960
SH 52 over NOBLE CANAL
Built 1990
STC3830;W ID BLVD over SEVEN MILE SLOUGH
Built 1973
Bridge Details
- Structure #
- 000000000028160
- Year Built
- 1973
- Length
- 21 m (68.9 ft)
- Max Span
- 20.7 m
- Width
- 8.3 m (27.2 ft)
- Lanes
- 2
- Daily Traffic
- 2,500
- Material
- Prestressed Concrete
- Design
- Tee Beam
- Owner
- County Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $651,000
- Total Project Cost
- $977,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.