BOWMAN ROAD over FARMERS COOP CANAL
1.0 S. 6.1 W. EMMETT · County 045, Idaho · Built 1967 · 2 Lanes · 340 vehicles/day
Overall
Deck
6
Satisfactory
Superstructure
6
Satisfactory
Substructure
5
Fair
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 6 | Satisfactory |
| Superstructure | 6 | Satisfactory |
| Substructure | 5 | Fair |
Location
43.861511, -116.622483
This bridge is in worse condition than 56.1% of bridges in County 045. The average bridge in Idaho is 0 years old; this one is 59 years old.
Nearby Bridges
STC 3831;S. SLOPE over FARMERS COOP CANAL
Built 2023
STC3831;LTL FRZOUT over BLACK CANYON CANAL
Built 1973
SH 52 over DRAIN DITCH
Built 1988
W SOUTH SLOPE RD over FARMERS COOP CANAL
Built 1955
VANDERDASSON RD over SEVEN MILE SLOUGH
Built 2013
STC3830;IDAHO BLVD over PAYETTE RIVER;E.LETHA BR
Built 1960
STC3830;W ID BLVD over SEVEN MILE SLOUGH
Built 1973
SH 52 over NOBLE CANAL
Built 1990
BISHOP ROAD over FARMERS COOP CANAL
Built 2010
STC 3842;STAR LANE over FARMERS COOP CANAL
Built 1976
Bridge Details
- Structure #
- 000000000028020
- Year Built
- 1967
- Length
- 7 m (23 ft)
- Max Span
- 6.7 m
- Width
- 7.4 m (24.3 ft)
- Lanes
- 2
- Daily Traffic
- 340
- Material
- Prestressed Concrete
- Design
- Tee Beam
- Owner
- County Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $213,000
- Total Project Cost
- $319,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.