STC 8483;DAVIS AVE over PHYLLIS CANAL
IN NAMPA;DAVIS AVE · County 027, Idaho · Built 1971 · 2 Lanes · 5,400 vehicles/day
Overall
Deck
5
Fair
Superstructure
5
Fair
Substructure
5
Fair
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 5 | Fair |
| Superstructure | 5 | Fair |
| Substructure | 5 | Fair |
Location
43.585022, -116.588253
This bridge is in worse condition than 79.7% of bridges in County 027. The average bridge in Idaho is 0 years old; this one is 55 years old.
Nearby Bridges
SUNNY LANE over PHYLLIS CANAL
Built 1974
SMA 8233;MIDLAND B over PHYLLIS CANAL
Built 1973
N. PARK DRIVE over PHYLLIS CANAL
Built 1977
STC8373;CANYON ST. over PHYLLIS CANAL
Built 2003
I 84B over PHYLLIS CANAL
Built 1970
SMA 8383;LONE STAR over PHYLLIS CANAL
Built 1973
STC8223;NORTHSIDE over UPRR;NAMPA RR OVERPASS
Built 1968
BROADMORE WAY over INDIAN CREEK
Built 1948
1ST AVE NORTH over INDIAN CREEK
Built 2002
2ND AVE N over INDIAN CREEK
Built 1976
Bridge Details
- Structure #
- 000000000027740
- Year Built
- 1971
- Length
- 12.5 m (41 ft)
- Max Span
- 11.9 m
- Width
- 12.8 m (42 ft)
- Lanes
- 2
- Daily Traffic
- 5,400
- Material
- Prestressed Concrete
- Design
- Tee Beam
- Owner
- City or Municipal Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $612,000
- Total Project Cost
- $918,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.