STC8223;NORTHSIDE over UPRR;NAMPA RR OVERPASS

IN NAMPA · County 027, Idaho · Built 1968 · 4 Lanes · 29,000 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
5
Fair
Substructure
6
Satisfactory

Bridge Details

Structure #
000000000014730
Year Built
1968
Reconstructed
2009
Length
131.1 m (430.1 ft)
Max Span
35.4 m
Width
22.7 m (74.5 ft)
Lanes
4
Daily Traffic
29,000
Material
Steel
Design
Stringer/Multi-beam or Girder
Owner
City or Municipal Highway Agency
Last Inspected
N/A
Est. Improvement
$4,706,000
Total Project Cost
$7,059,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.