TUCKER ROAD over DIXIE SLOUGH
1.2 N. 3.4 E. WILDER · County 027, Idaho · Built 1990 · 1 Lanes · 20 vehicles/day
Overall
Deck
7
Good
Superstructure
6
Satisfactory
Substructure
6
Satisfactory
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 7 | Good |
| Superstructure | 6 | Satisfactory |
| Substructure | 6 | Satisfactory |
Location
43.697772, -116.837814
This bridge is in worse condition than 30.2% of bridges in County 027. The average bridge in Idaho is 0 years old; this one is 36 years old.
Nearby Bridges
TUCKER ROAD over RIVERSIDE CANAL
Built 1999
STC 3740;NOTUS RD over RIVERSIDE CANAL
Built 1940
VAN SLYKE ROAD over GOLDEN GATE CANAL
Built 1994
STC 3740;NOTUS RD over BOISE RIVER;NOTUS BRIDGE
Built 1996
LOW PLEASANT RD over GOLDEN GATE CANAL
Built 1994
TUCKER ROAD over GOLDEN GATE CANAL
Built 1965
BLUFF LANE over RIVERSIDE CANAL
Built 1985
STC3717;FRIENDS RD over GOLDEN GATE CANAL
Built 1967
STC 3790;ALLENDALE over GOLDEN GATE CANAL
Built 1992
VAN SLYKE ROAD over DEER FLAT CANAL
Built 1992
Bridge Details
- Structure #
- 000000000026950
- Year Built
- 1990
- Length
- 8.8 m (28.9 ft)
- Max Span
- 8.2 m
- Width
- 7.6 m (24.9 ft)
- Lanes
- 1
- Daily Traffic
- 20
- Material
- Steel
- Design
- Stringer/Multi-beam or Girder
- Owner
- Other Local Agencies
- Last Inspected
- N/A
- Est. Improvement
- $231,000
- Total Project Cost
- $347,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.