PACKER JOHN ROAD over GOOSE CREEK

1.0 E. 0.2 S. MEADOWS · County 003, Idaho · Built 1960 · 2 Lanes · 80 vehicles/day

Overall
Fair
Deck
7
Good
Superstructure
7
Good
Substructure
5
Fair

Bridge Details

Structure #
000000000026620
Year Built
1960
Reconstructed
1993
Length
9.1 m (29.9 ft)
Max Span
8.5 m
Width
5.5 m (18 ft)
Lanes
2
Daily Traffic
80
Material
Steel
Design
Stringer/Multi-beam or Girder
Owner
County Highway Agency
Last Inspected
N/A
Est. Improvement
$240,000
Total Project Cost
$360,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.