US 95 over LITTLE SALMON RIVER

0.2 W. NEW MEADOWS WCL · County 003, Idaho · Built 2021 · 2 Lanes · 3,300 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
8
Very Good

Bridge Details

Structure #
000000000018246
Year Built
2021
Length
25.3 m (83 ft)
Max Span
23.8 m
Width
13.8 m (45.3 ft)
Lanes
2
Daily Traffic
3,300
Material
Prestressed Concrete
Design
Tee Beam
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.