300 EAST ROAD over U CANAL

3.2 N. 3.0 E. JEROME · County 053, Idaho · Built 1962 · 2 Lanes · 360 vehicles/day

Overall
Fair
Deck
7
Good
Superstructure
6
Satisfactory
Substructure
6
Satisfactory

Bridge Details

Structure #
000000000024805
Year Built
1962
Length
31.7 m (104 ft)
Max Span
15.5 m
Width
7.5 m (24.6 ft)
Lanes
2
Daily Traffic
360
Material
Prestressed Concrete
Design
Tee Beam
Owner
Other Local Agencies
Last Inspected
N/A
Est. Improvement
$644,000
Total Project Cost
$965,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.