200 EAST ROAD over T.F.NORTHSIDE MAIN CNL
3.1 N. 2.0 E. JEROME · County 053, Idaho · Built 1970 · 2 Lanes · 310 vehicles/day
Structurally Deficient
— One or more key components rated 4 (Poor) or below
Overall
Deck
4
Poor
Superstructure
6
Satisfactory
Substructure
5
Fair
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 4 | Poor |
| Superstructure | 6 | Satisfactory |
| Substructure | 5 | Fair |
Location
42.768014, -114.48275
This bridge is in worse condition than 91% of bridges in County 053. The average bridge in Idaho is 0 years old; this one is 56 years old.
Nearby Bridges
200 EAST ROAD over J CANAL
Built 2007
100 EAST ROAD over U CANAL
Built 1990
300 EAST ROAD over J CANAL
Built 1986
300 N ROAD over S CANAL
Built 2017
400 NORTH ROAD over R CANAL
Built 1965
STC2757;NORTH ROAD over U CANAL
Built 1954
STC2757;NORTH ROAD over S CANAL
Built 1999
400 EAST ROAD over U CANAL
Built 1981
STC2755;200 NORTH over J CANAL
Built 1990
400 EAST ROAD over R CANAL
Built 1974
Bridge Details
- Structure #
- 000000000024690
- Year Built
- 1970
- Length
- 11.3 m (37.1 ft)
- Max Span
- 10.7 m
- Width
- 7.3 m (24 ft)
- Lanes
- 2
- Daily Traffic
- 310
- Material
- Concrete
- Design
- Tee Beam
- Owner
- Other Local Agencies
- Last Inspected
- N/A
- Est. Improvement
- $277,000
- Total Project Cost
- $416,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.