KING LANE over WARM SPRING CREEK
2.0 S. 1.4 W. ROCKLAND · County 077, Idaho · Built 1965 · 2 Lanes · 80 vehicles/day
Overall
Deck
6
Satisfactory
Superstructure
6
Satisfactory
Substructure
5
Fair
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 6 | Satisfactory |
| Superstructure | 6 | Satisfactory |
| Substructure | 5 | Fair |
Location
42.545078, -112.900597
This bridge is in worse condition than 81.7% of bridges in County 077. The average bridge in Idaho is 0 years old; this one is 61 years old.
Nearby Bridges
HOUTZ CANYON RD over S.FK. ROCK CREEK
Built 1980
HALLING ROAD over ROCK CREEK
Built 1971
KUPER ROAD over ROCK CREEK
Built 1939
NELSON LANE over SO. FK. ROCK CREEK
Built 1985
FLINT ROAD over ROCK CREEK
Built 1978
LANDING ROAD over ROCK CREEK
Built 1978
I 86 EBL over ROCK CR;MASSACRE ROCK BR
Built 1980
REGISTER RD over I 86;CO FRONTAGE RD GS
Built 1983
I 86 WBL over ROCK CR;MASSACRE ROCK BR
Built 1963
FRONTAGE ROAD over ROCK CR;REGISTER ROCK BR
Built 1981
Bridge Details
- Structure #
- 000000000023530
- Year Built
- 1965
- Reconstructed
- 1972
- Length
- 7.9 m (25.9 ft)
- Max Span
- 6.7 m
- Width
- 7.3 m (24 ft)
- Lanes
- 2
- Daily Traffic
- 80
- Material
- Steel
- Design
- Stringer/Multi-beam or Girder
- Owner
- County Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $180,000
- Total Project Cost
- $270,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.