KUPER ROAD over ROCK CREEK
5.0 S. 1.9 E. ROCKLAND · County 077, Idaho · Built 1939 · 2 Lanes · 80 vehicles/day
Overall
Deck
6
Satisfactory
Superstructure
6
Satisfactory
Substructure
6
Satisfactory
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 6 | Satisfactory |
| Superstructure | 6 | Satisfactory |
| Substructure | 6 | Satisfactory |
Location
42.501758, -112.841817
This bridge is in worse condition than 38% of bridges in County 077. The average bridge in Idaho is 0 years old; this one is 87 years old.
Bridge Details
- Structure #
- 000000000023475
- Year Built
- 1939
- Reconstructed
- 1978
- Length
- 9.1 m (29.9 ft)
- Max Span
- 8.5 m
- Width
- 8.5 m (27.9 ft)
- Lanes
- 2
- Daily Traffic
- 80
- Material
- Prestressed Concrete
- Design
- Tee Beam
- Owner
- County Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- N/A
- Total Project Cost
- N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.