MINGO ROAD over BENCH CANAL
0.2 N. 0.2 E. GRACE · County 029, Idaho · Built 2012 · 2 Lanes · 30 vehicles/day
Overall
Deck
6
Satisfactory
Superstructure
6
Satisfactory
Substructure
7
Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 6 | Satisfactory |
| Superstructure | 6 | Satisfactory |
| Substructure | 7 | Good |
Location
42.583806, -111.726639
This bridge is in worse condition than 26.7% of bridges in County 029. The average bridge in Idaho is 0 years old; this one is 14 years old.
Nearby Bridges
SH 34 over BEAR RIVER;GRACE BRIDGE
Built 1974
SH 34 over NORTH EXTENSION CANAL
Built 1978
STC 1775;TURNER RD over PACIFICORP PENSTOCK
Built 2016
LAST CHANCE LANE over TANNER CANAL;NE.GRACE BR
Built 1958
STC 1775;TURNER RD over BEAR R.;GRACE-TURNER BR.
Built 1955
BURTON ROAD over LAST CHANCE CANAL
Built 1983
GIBSON LANE over N. EXTENSION CANAL
Built 2002
ANDERSON ROAD over N. EXTENSION CANAL
Built 2002
STC 1769;RIVER RD over BEAR R;CHEESECAKE FAC BR
Built 1975
VALLEY VIEW DRIVE over SODA CANAL
Built 1980
Bridge Details
- Structure #
- 000000000023228
- Year Built
- 2012
- Length
- 13 m (42.7 ft)
- Max Span
- 11.7 m
- Width
- 9.4 m (30.8 ft)
- Lanes
- 2
- Daily Traffic
- 30
- Material
- Steel
- Design
- Stringer/Multi-beam or Girder
- Owner
- County Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $320,000
- Total Project Cost
- $480,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.