STC 1775;TURNER RD over BEAR R.;GRACE-TURNER BR.
0.6 W. GRACE · County 029, Idaho · Built 1955 · 2 Lanes · 350 vehicles/day
Overall
Deck
7
Good
Superstructure
6
Satisfactory
Substructure
6
Satisfactory
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 7 | Good |
| Superstructure | 6 | Satisfactory |
| Substructure | 6 | Satisfactory |
Location
42.576761, -111.751297
This bridge is in worse condition than 26.7% of bridges in County 029. The average bridge in Idaho is 0 years old; this one is 71 years old.
Nearby Bridges
STC 1775;TURNER RD over PACIFICORP PENSTOCK
Built 2016
SH 34 over BEAR RIVER;GRACE BRIDGE
Built 1974
MINGO ROAD over BENCH CANAL
Built 2012
SH 34 over NORTH EXTENSION CANAL
Built 1978
LAST CHANCE LANE over TANNER CANAL;NE.GRACE BR
Built 1958
GIBSON LANE over N. EXTENSION CANAL
Built 2002
BURTON ROAD over LAST CHANCE CANAL
Built 1983
ANDERSON ROAD over N. EXTENSION CANAL
Built 2002
STC 1769;RIVER RD over BEAR R;CHEESECAKE FAC BR
Built 1975
SANT ROAD over BEAR RIVER;SW NITER BR
Built 1991
Bridge Details
- Structure #
- 000000000019170
- Year Built
- 1955
- Length
- 92.7 m (304.1 ft)
- Max Span
- 36.6 m
- Width
- 8.4 m (27.6 ft)
- Lanes
- 2
- Daily Traffic
- 350
- Material
- Steel
- Design
- Stringer/Multi-beam or Girder
- Owner
- County Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $1,600,000
- Total Project Cost
- $2,400,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.