KELLY TOPONCE ROAD over RELIEF CHANNEL
3.9 N. 5.2 W. BANCROFT · County 029, Idaho · Built 1964 · 2 Lanes · 160 vehicles/day
Overall
Deck
6
Satisfactory
Superstructure
6
Satisfactory
Substructure
5
Fair
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 6 | Satisfactory |
| Superstructure | 6 | Satisfactory |
| Substructure | 5 | Fair |
Location
42.775497, -111.986714
This bridge is in worse condition than 77.8% of bridges in County 029. The average bridge in Idaho is 0 years old; this one is 62 years old.
Nearby Bridges
KELLY TOPONCE ROAD over PORTNEUF RIVER
Built 2008
PEBBLE CREEK ROAD over PORTNEUF R;PEBBLE BR
Built 1984
NIPPER ROAD over DOWNY MARSH VALLEY CNL
Built 1986
STC 1759;OLD HW 30 over DRAIN DITCH
Built 1977
KELLY TOPONCE RD over CHESTERFIELD CANAL
Built 2002
STC 1759;OLD HW 30 over DRAIN DITCH
Built 1976
BROXON ROAD over PORTNEUF RIVER
Built 1986
CHESTERFIELD RES R over CHESTERFIELD CANAL
Built 2005
SYMONS ROAD over PORTNEUF RIVER
Built 1986
US 30 over DEER CROSSING
Built 1977
Bridge Details
- Structure #
- 000000000023220
- Year Built
- 1964
- Length
- 10.1 m (33.1 ft)
- Max Span
- 9.4 m
- Width
- 8.4 m (27.6 ft)
- Lanes
- 2
- Daily Traffic
- 160
- Material
- Prestressed Concrete
- Design
- Tee Beam
- Owner
- County Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $267,000
- Total Project Cost
- $401,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.