US 30 over DEER CROSSING
2.5 E. LAVA HOT SPRINGS · County 005, Idaho · Built 1977 · 3 Lanes · 4,300 vehicles/day
Overall
Deck
5
Fair
Superstructure
6
Satisfactory
Substructure
6
Satisfactory
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 5 | Fair |
| Superstructure | 6 | Satisfactory |
| Substructure | 6 | Satisfactory |
Location
42.663614, -112.014019
This bridge is in worse condition than 72.7% of bridges in County 005. The average bridge in Idaho is 0 years old; this one is 49 years old.
Nearby Bridges
SYMONS ROAD over PORTNEUF RIVER
Built 1986
BROXON ROAD over PORTNEUF RIVER
Built 1986
STC 1759; BLAZER over PORTNEUF RIVER
Built 2009
US 30 over PORTNEUF RIVER
Built 1977
US 30B over PORTNEUF RIVER;IN LAVA
Built 1962
STC 1757;MAIN ST over PORTNEUF RIVER
Built 1962
US 30 over DEER CROSSING
Built 1977
US 30 over PORTNEUF RIVER
Built 2008
US 30 over DEER CROSSING
Built 1976
PEBBLE CREEK ROAD over PORTNEUF R;PEBBLE BR
Built 1984
Bridge Details
- Structure #
- 000000000013725
- Year Built
- 1977
- Length
- 23.2 m (76.1 ft)
- Max Span
- 22.9 m
- Width
- 16.4 m (53.8 ft)
- Lanes
- 3
- Daily Traffic
- 4,300
- Material
- Prestressed Concrete
- Design
- Stringer/Multi-beam or Girder
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $719,000
- Total Project Cost
- $1,079,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.