US 30 over PORTNEUF RIVER
AT LAVA HOT SPRINGS ECL · County 005, Idaho · Built 1977 · 3 Lanes · 4,300 vehicles/day
Overall
Deck
5
Fair
Superstructure
5
Fair
Substructure
6
Satisfactory
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 5 | Fair |
| Superstructure | 5 | Fair |
| Substructure | 6 | Satisfactory |
Location
42.622917, -111.996333
This bridge is in worse condition than 72.7% of bridges in County 005. The average bridge in Idaho is 0 years old; this one is 49 years old.
Nearby Bridges
STC 1757;MAIN ST over PORTNEUF RIVER
Built 1962
US 30 over DEER CROSSING
Built 1977
STC 1759; BLAZER over PORTNEUF RIVER
Built 2009
US 30B over PORTNEUF RIVER;IN LAVA
Built 1962
US 30 over DEER CROSSING
Built 1976
US 30 over PORTNEUF RIVER
Built 2008
US 30 over DEER CROSSING
Built 1977
SYMONS ROAD over PORTNEUF RIVER
Built 1986
BROXON ROAD over PORTNEUF RIVER
Built 1986
US 30 over UPRR & CANAL; TOPAZ OP
Built 2011
Bridge Details
- Structure #
- 000000000013715
- Year Built
- 1977
- Length
- 77.7 m (254.9 ft)
- Max Span
- 37.2 m
- Width
- 16.3 m (53.5 ft)
- Lanes
- 3
- Daily Traffic
- 4,300
- Material
- Prestressed Concrete
- Design
- Stringer/Multi-beam or Girder
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $2,940,000
- Total Project Cost
- $4,410,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.