PARKLANE; E 1200 N over E.BR.SNAKE R.VALLEY CNL

1.0 S. 1.3 E. SHELLEY · County 011, Idaho · Built 1977 · 2 Lanes · 1,300 vehicles/day

Overall
Fair
Deck
7
Good
Superstructure
6
Satisfactory
Substructure
7
Good

Bridge Details

Structure #
000000000022950
Year Built
1977
Length
7.3 m (24 ft)
Max Span
7 m
Width
9.7 m (31.8 ft)
Lanes
2
Daily Traffic
1,300
Material
Prestressed Concrete
Design
Tee Beam
Owner
County Highway Agency
Last Inspected
N/A
Est. Improvement
$207,000
Total Project Cost
$310,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.