FOUNDRY RD;E 1100N over E.BR.SNAKE R.VALLEY CNL

2.0 S. 1.4 E. SHELLEY · County 011, Idaho · Built 1965 · 2 Lanes · 190 vehicles/day

Overall
Fair
Deck
7
Good
Superstructure
6
Satisfactory
Substructure
6
Satisfactory

Bridge Details

Structure #
000000000022650
Year Built
1965
Reconstructed
1984
Length
7.9 m (25.9 ft)
Max Span
7.6 m
Width
10.4 m (34.1 ft)
Lanes
2
Daily Traffic
190
Material
Steel
Design
Stringer/Multi-beam or Girder
Owner
County Highway Agency
Last Inspected
N/A
Est. Improvement
$150,000
Total Project Cost
$225,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.