BASELINE ROAD over SAND CREEK

1.0 S. 2.7 E. SHELLEY · County 011, Idaho · Built 1990 · 2 Lanes · 910 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
6
Satisfactory
Substructure
7
Good

Bridge Details

Structure #
000000000022916
Year Built
1990
Length
11.3 m (37.1 ft)
Max Span
10.7 m
Width
12.2 m (40 ft)
Lanes
2
Daily Traffic
910
Material
Steel
Design
Stringer/Multi-beam or Girder
Owner
County Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.