E. CENTER ROAD over BLACKFOOT CANAL
IN FIRTH · County 011, Idaho · Built 1972 · 2 Lanes · 1,300 vehicles/day
Overall
Deck
7
Good
Superstructure
6
Satisfactory
Substructure
6
Satisfactory
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 7 | Good |
| Superstructure | 6 | Satisfactory |
| Substructure | 6 | Satisfactory |
Location
43.30445, -112.180136
This bridge is in worse condition than 17.1% of bridges in County 011. The average bridge in Idaho is 0 years old; this one is 54 years old.
Nearby Bridges
FIRTH ROAD over BLACKFOOT CANAL
Built 1970
HIGHLINE ROAD over BLACKFOOT CANAL
Built 1971
HIGHLINE ROAD over RESERVATION CANAL
Built 1977
STC 1843; E 800 N over BLACKFOOT CANAL
Built 2006
STC 1843; E 800 N over RESERVATION CANAL
Built 2006
STC 1843; FIRTH RD over SNAKE RIVER;FIRTH BRIDGE
Built 2003
S. FIRTH ROAD over RESERVATION CANAL
Built 1967
N 550 E;IDAHO ROAD over BLACKFOOT CANAL
Built 1962
US 91 over RESERVATION CANAL
Built 2000
STC 1840;WOLVERINE over RESERVATION CANAL
Built 1966
Bridge Details
- Structure #
- 000000000022845
- Year Built
- 1972
- Length
- 12.8 m (42 ft)
- Max Span
- 12.5 m
- Width
- 10.7 m (35.1 ft)
- Lanes
- 2
- Daily Traffic
- 1,300
- Material
- Prestressed Concrete
- Design
- Tee Beam
- Owner
- City or Municipal Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $402,000
- Total Project Cost
- $603,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.