N 550 E;IDAHO ROAD over BLACKFOOT CANAL
0.8 S. 0.2 W. FIRTH · County 011, Idaho · Built 1962 · 2 Lanes · 300 vehicles/day
Overall
Deck
6
Satisfactory
Superstructure
6
Satisfactory
Substructure
5
Fair
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 6 | Satisfactory |
| Superstructure | 6 | Satisfactory |
| Substructure | 5 | Fair |
Location
43.293167, -112.188225
This bridge is in worse condition than 76% of bridges in County 011. The average bridge in Idaho is 0 years old; this one is 64 years old.
Nearby Bridges
HIGHLINE ROAD over BLACKFOOT CANAL
Built 1971
S. FIRTH ROAD over RESERVATION CANAL
Built 1967
HIGHLINE ROAD over RESERVATION CANAL
Built 1977
STC 1840;WOLVERINE over RESERVATION CANAL
Built 1966
E. CENTER ROAD over BLACKFOOT CANAL
Built 1972
STC 1840;WOLVERINE over BLACKFOOT CANAL
Built 1964
FIRTH ROAD over BLACKFOOT CANAL
Built 1970
STC 1843; FIRTH RD over SNAKE RIVER;FIRTH BRIDGE
Built 2003
STC 1843; E 800 N over BLACKFOOT CANAL
Built 2006
STC 1843; E 800 N over RESERVATION CANAL
Built 2006
Bridge Details
- Structure #
- 000000000022390
- Year Built
- 1962
- Length
- 16.2 m (53.1 ft)
- Max Span
- 15.2 m
- Width
- 8.5 m (27.9 ft)
- Lanes
- 2
- Daily Traffic
- 300
- Material
- Prestressed Concrete
- Design
- Tee Beam
- Owner
- County Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $381,000
- Total Project Cost
- $572,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.