FT HALL MAIN CNL over HARVEST SPG BLVD
IN CHUBBUCK · County 005, Idaho · Built 2022 · 4 Lanes · 500 vehicles/day
Overall
Superstructure
9
Excellent
Substructure
9
Excellent
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Superstructure | 9 | Excellent |
| Substructure | 9 | Excellent |
Location
42.945936, -112.45225
This bridge is in worse condition than 0.8% of bridges in County 005. The average bridge in Idaho is 0 years old; this one is 4 years old.
Nearby Bridges
2-1/2 MILE ROAD over FORT HALL MAIN CANAL
Built 2011
SAGE HOLLOW over FORT HALL MAIN CANAL
Built 1980
S7241;NRTHGTE PKWY over I 15 NB-SB;NORTHGATE IC
Built 2020
2-1/2 MILE ROAD over I 15;2-1/2 MILE ROAD GS
Built 1959
OLYMPUS DR over FUTURE PED UNDERPASS
Built 2018
I 15 SBL over STP7041;CHUBBUCK ROAD
Built 2024
I 15 NBL over STP7041;CHUBBUCK ROAD
Built 2023
I 15 SBL over PRIVATE RD.;MACHINE PASS
Built 1959
I 15 NBL over PRIVATE RD.;MACHINE PASS
Built 1959
I 15 NBL over I 86 EB RAMP
Built 2023
Bridge Details
- Structure #
- 000000000021918
- Year Built
- 2022
- Length
- 10.4 m (34.1 ft)
- Max Span
- 10.4 m
- Width
- 30.5 m (100.1 ft)
- Lanes
- 4
- Daily Traffic
- 500
- Material
- Concrete
- Design
- Arch - Deck
- Owner
- City or Municipal Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- N/A
- Total Project Cost
- N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.