I 15 NBL over STP7041;CHUBBUCK ROAD
1.9 E. CHUBBUCK · County 005, Idaho · Built 2023 · 2 Lanes · 11,750 vehicles/day
Overall
Deck
9
Excellent
Superstructure
9
Excellent
Substructure
9
Excellent
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 9 | Excellent |
| Superstructure | 9 | Excellent |
| Substructure | 9 | Excellent |
Location
42.920194, -112.440861
This bridge is in worse condition than 0.8% of bridges in County 005. The average bridge in Idaho is 0 years old; this one is 3 years old.
Nearby Bridges
I 15 SBL over STP7041;CHUBBUCK ROAD
Built 2024
I 15 NBL over I 86 EB RAMP
Built 2023
I 15 SBL over I 86 EB RAMP
Built 2024
I86 EB OFF RAMP over RAMP EN OVER RAMP NW
Built 2024
I86 EB OFF RAMP over Ramp EN OVER RAMP NW
Built 2024
I 15 SBL over I 86 WB RAMP
Built 2024
I 15 NBL over I 86 WB RAMP
Built 2023
OLYMPUS DR over FUTURE PED UNDERPASS
Built 2018
I 86 WBL over HILINE ROAD GS
Built 2010
I 86 EBL over HILINE ROAD GS
Built 2009
Bridge Details
- Structure #
- 000000000021221
- Year Built
- 2023
- Length
- 40.5 m (132.9 ft)
- Max Span
- 39.9 m
- Width
- 25.2 m (82.7 ft)
- Lanes
- 2
- Daily Traffic
- 11,750
- Material
- Prestressed Concrete
- Design
- Stringer/Multi-beam or Girder
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- N/A
- Total Project Cost
- N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.