I 86 EBL over HILINE ROAD GS

0.8 E. CHUBBUCK · County 005, Idaho · Built 2009 · 3 Lanes · 11,750 vehicles/day

Overall
Fair
Deck
7
Good
Superstructure
6
Satisfactory
Substructure
8
Very Good

Bridge Details

Structure #
000000000010911
Year Built
2009
Length
33.8 m (110.9 ft)
Max Span
32.9 m
Width
18.9 m (62 ft)
Lanes
3
Daily Traffic
11,750
Material
Prestressed Concrete
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.